Skylights & rooflights in Horley

Planning in Horley turns on the address: Reigate & Banstead Borough Council is the authority, one conservation area runs along Massetts Road, and the national register shows Article 4 direction areas nearby whose scope it does not state.

Ink and watercolour drawing of a street of houses typical of Horley
  1. 1Street
  2. 2Access
  3. 3Roof
From Brighton & Hove
30 miles north by road
Planning authority
Reigate and Banstead Borough Council
County
Surrey

Horley

Massetts Road and the question of what Article 4 covers

Horley lies 29.9 road miles north of central Brighton & Hove, just inside Surrey. We fit new units and replace old ones here as part of the work we do from Brighton & Hove, and every job begins with a free survey and ends in a fixed written quote.

Sheet 01

Horley houses and their roofs

Scale: the houses

Horley's growth tells you what you will find on its roofs. The oldest buildings are in Horley Row. The railway arrived in 1841, but the town grew slowly until around 1950, and after that it became a dormitory town for London commuters. A 2005 master plan has since allowed substantial new housing. In plain terms, that gives us three broad ages of roof to think about: the old, the mid-century and the recent.

Terraced houses with roof windows set into the slate roofs
Roof windows fitted into the slopes of slate roofs

The old buildings

Older properties have older construction under the covering. Rafters may be irregular, the roof space may be shallow, and the timber around any opening has to be looked at closely before we promise a position. A rooflight in an old roof is possible, but the structure tells us how big it can be and where it can go.

The roof covering of an old building is often not the original one, and the work underneath may differ from what the surface suggests. We look from the loft first, because the underside of a roof tells the truth about its timbers and its history. If the structure is sound, a rooflight is a matter of careful trimming. If it is not, the quote includes the strengthening, written out in plain words.

Mid-century and commuter-era homes

Houses from the decades after 1950, when Horley grew into a home for London commuters, have roofs that are generally simple, with usable loft spaces and more regular structures. Roof windows for loft rooms, tubes for hallways and rooflights for rear extensions are the usual requests, and the work is straightforward once the access is arranged.

Newer estates

Recent houses are often built with trussed rafters, which are designed as a whole and cannot be cut like a hand-framed roof. Fitting a window in a trussed roof calls for a structural solution that has to be agreed in advance, and it is not always the right answer. A sun tunnel, which needs little structural change, is often the better route in a newer house.

Whatever the age, the plan is the same. We find out what is above the room, what the roof is made of and how it can be reached, and we put the findings in writing before you commit to anything.

Two local details are worth mentioning at the survey. If your house is close to the main line through Horley station, tell us, because a route for a tower or a delivery may need to avoid a station car park or a busy approach road. If your garden runs down towards the River Mole, mention that too, since soft or sloping ground at the back changes where a scaffold base can safely stand.

Sheet 02

What the council will want to know

Scale: the council

Planning decisions for Horley are made by Reigate and Banstead Borough Council. Building Control for the area is run through the Southern Building Control Partnership, which also covers Tandridge and Mole Valley.

The national planning register shows one conservation area in the town, Massetts Road, designated in 2003. They also show two Article 4 direction areas within a kilometre of the centre, but the register does not say what those directions cover. Whether your own street falls inside one of them is something only the council can confirm, so ask them with your full address. Our planning guide sets out what to ask and how the answer is likely to read.

It saves time to settle the planning question before the survey. Find out whether your road is in or near the conservation area, ask the council whether either of the nearby Article 4 areas touches your address, and note the answer. If the news is that consent is needed, the design can be shaped to suit, and we can talk through the drawings the council would want to see.

Planning and Building Control are separate. Planning asks whether the change may be made at all, and Building Control asks whether it is built properly. Passing one does not replace the other, and each has its own paperwork.

When a roof opening is new, the structure matters to Building Control as much as the glass does. Our Building Regulations guide goes through the checks, so you can see what the notification covers and why it is made before work starts.

Sheet 03

Reaching the roof in Horley

Scale: the street

The access plan is the page in every quote that explains how we reach your roof. For a commuter-era house on a road with a front drive, the answer is often a tower or scaffold at the side or front, with the drive doing the job a pavement licence would otherwise do. For a terraced house, a front scaffold may need a licence, and for a rear extension the route might be through a side gate into the garden.

Where a licence is needed for the pavement or a parking bay, it comes from the highway authority, which in Horley is Surrey County Council, and we make the application. Our scaffold licence guide explains the process in more detail, and the access plan page shows what goes on the sheet.

White kitchen with an island and a large rooflight in the ceiling above
A rooflight lighting a kitchen from above

Wherever cars park along the kerb, a delivery lorry needs a clear space to stand. We agree a delivery window with you and tell you which cars to move, so the vehicle can stand where it is needed. Neighbours get notice in advance, which saves a surprised conversation on the day.

Rear access deserves a closer look on semi-detached and terraced houses. The route to the back is often a narrow side passage, and the width of that passage decides whether a tower, a lightweight platform or a full scaffold is the sensible choice. We measure it at the survey, and the plan names the equipment we intend to use.

Flats and maisonettes are a different case. The roof of a converted building is usually the freeholder's, and consent may be needed before work begins. Our leasehold guide explains the questions to ask, and your lease holds the answers.

Sheet 04

Which unit for which house

Scale: the glass

The choice of product follows the roof and the room. A loft room under a pitched roof takes a roof window. A rear extension takes a flat roof rooflight or a lantern. A dark hallway takes a tube. The decision usually comes down to two questions: what is the structure above the room, and what do you want from the glass?

Take the room first and the roof second. A bedroom wants a window you can see out of. A landing wants brightness above all. A kitchen wants a bit of ventilation as well as light, and an extension with a flat ceiling wants height. Once the purpose is clear, the roof narrows the options, and the survey confirms which are workable.

Pitched or flat

Roof windows

Set into the slope and following its pitch.

  • Give light and a view from a loft room
  • Open for air
  • Need rafters that can be trimmed safely

Flat roof rooflights

Raised on a kerb above a flat roof.

  • Suit extensions and kitchens
  • Lanterns add ceiling height
  • Need a sound roof surface and good falls

Our roof windows page, flat roof rooflights page and roof lanterns page give the sizes and options. For a dark hall or bathroom with no room for a window, the sun tunnels page shows how a tube is fitted.

If you want to open a high unit without a pole, there are electric versions too, covered on the electric and opening rooflights page. Where you want a unit you can walk across, such as over a basement stair or a flat roof terrace, see walk-on rooflights.

Sheet 05

Replacing what has aged

Scale: the old unit

Horley has been building for a long time, so some of its rooflights are well past their best. The signs of age are plain once you know them: cloudy glass between the panes, a frame that has swelled or split, a handle that no longer holds, or a mark on the ceiling beneath. A misted unit has a failed seal, and the answer is to assess it and fit a new one. The misted and failed rooflights page explains what we look for.

A replacement is a chance to improve the room. A modern unit has better glazing and a tighter fit than one from decades ago, and our energy efficient rooflights page explains what the options do. The opening usually stays the same size, which means the ceiling finish inside the room can be left alone.

Roof window fitted in the tiled roof of a semi-detached house, seen from the garden

Sometimes the old unit is sound and only looks tired, and we tell you honestly which situation you are in. Where the glass has failed, a new unit is the answer, and where the frame is rotten, the same applies.

What we look at when replacing a unit
PartWhat we checkWhy
Glass and sealMisting, cracksShows if the unit has failed
FrameRot, warp, corrosionShows whether decay has spread
FlashingFit to the coveringKeeps water out
SurroundTimber, kerb, membraneA new unit needs sound support

Our workmanship guarantee lasts 10 years and applies to each Horley installation. The guarantee page explains the terms.

Sheet 06

What owners ask before booking

Scale: the kitchen table

Before a survey, owners in a commuter town tend to ask about the same few things, and it is worth setting out our answers.

Will it need planning?

That depends on your house and your address. Houses and flats are treated differently, and some areas carry extra controls. Check with Reigate and Banstead Borough Council, and read the planning guide beforehand.

How long will the roof be open?

For a straightforward replacement, the roof is open for part of a day and is closed in before we leave. A new opening in the structure takes longer, and we explain the timing at the survey. We cover the floor and furniture below, and agree which rooms we need to enter.

On a replacement, the order of work is easy to follow. The old unit comes out, the opening is cleaned up and checked, the new frame is set and fixed, and the flashing is dressed down over the covering. The last job is to test the operation of the sash and leave the roof tidy. On a new opening, the cutting and trimming come first, and the weathering follows once the structure is sound.

Dust and noise are modest on the roof but real inside, where the ceiling opening is formed or the old lining is disturbed. We lay dust sheets, keep the work area tight and clear up before we leave. If a new lining needs plastering or decorating, the quote tells you who does that, so that no part of the finish is left as an assumption.

Any hidden problems found once the old unit is out, such as rotten timber at the opening, are explained to you on the spot with a clear written price for the extra work before it goes ahead.

Can I stay in the house?

Yes. You can stay at home during the work. If you work from home or have someone who needs quiet, tell us at the survey and we arrange the day around you.

What does it cost?

We give a fixed written price after the survey. It depends on the unit, the covering, the access and the work to the surround. The costs page explains what moves it.

What next?

Ring 01273 282313, message 07880 284133 on WhatsApp or use the quote form, and we will book a visit. For the wider service, return to our Brighton & Hove home page.

Get a free survey

We survey before we price. WhatsApp or phone, whichever suits.

  • Fixed written quote with your access plan
  • Building Control notification handled
  • 10-year workmanship guarantee

Or call 01273 282313

Call Free quote